ensures the balance and consistency of the essential operate of parts. We are aiming to meet the requires of the customers close to the globe.. EPG is a expert maker and exporter that is worried with the design, development and generation. CE 3ton Entrance Wheel LoaEPTwith 2cbm Shovel
Search phrases colon Wheel Loader comma front loader comma loaEPTfor sale comma wheel loaEPT3ton
Our rewards colon
-We generate most of the elements in our possess manufacturing facility comma greater to control the good quality comma simpler to get components in the EPT
-Actual warranty for quality colon we will supply components as free inside guarantee if high quality difficulty
-EPT encounters in this market colon we started to exporting loaders from calendar year 2008 period
Characteristics of this design 3ton loader colon
1 rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT engine with much less oil usage comma reduced noise and modest emissions time period
2 rpar EPT and torque converter of 5 ton wheel loaEPTare of excellent applicability period of time
3 rpar Optimally developed functioning system and frames of wheel loaEPTare more robust and much more sturdy period of time
four rpar EPT responsibility unloading EPT program enhances the EPT wheel loaEPTperformance period of time
5 rpar The wheel loaEPTuses ideal EPT cylinders comma pumps and valve time period
Details colon
1 rpar EPT motor comma 130HP comma six cylinders comma 4 strokes comma drinking water cooling comma turbocharged comma EPT warranty time period ZL50 planetary type EPT with EPT converter comma 2 EPT and 1 reverse speeds comma same as 5ton wheel loader comma stronger for hefty responsibility time period EPT EPT shift time period EPT axles with caliper type service brake interval
2 rpar The robotically welded two-piece structural body layout gives a rugged and dependable basis for the EPT that increases steadiness comma performance comma and serviceability time period A robust articulating hitch technique joins the entrance and rear frames bettering durability time period Increased line routings throughout the hitch joint streamline the production procedure and improve dependability and longevity period
three rpar EPT structural components are all made by EPT time period All the parts are substantial high quality welded interval The ball blasting and vibration treatment method can launch the welding anxiety period UT lparEPT Tests rpar to inspect the welding defect time period It will form a great deal of modest pits on the floor soon after blasting and it will boost the paint adhesion period
4 rpar The sturdy axle uses a main EPT and two hub EPTs which are related by two shafts time period The principal EPT makes use of EPTl EPTs and the hub EPT uses planet EPTs period of time Dry variety caliper brake utilizes a brake shoe with a brake disc period of time It is far better for servicing and radiation interval
5 rpar The radiating spot of the large quality radiator is additional for much better radiation interval The temperature of the engine and the EPT can be controlled unEPTthe temperature boundaries time period It extends the services daily life the two of the engine and the EPT interval And it reduces the oil leak of the hoses and meanwhile the support daily life of hoses is extended also period of time
6 rpar Luxury cabin is outfitted each air conditioner and electrical admirer interval Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd interval The spacious cabin guarantees the relaxed operation and relaxation setting for the operators time period
7 rpar Solitary EPT EPTstick control is optional period The EPTstick can be moved EPT and back again to manage the growth lifting and down period The EPTstick can be moved left and rigEPT to manage the bucket dumping and loading period of time It is simple for procedure and the performance is much greater than the two EPT control program time period
8 rpar The steering wheel situation can be a minor modified period The instrument panel consists the meter of h2o temperature comma the meter of oil temperature comma the meter of gasoline degree comma the meter of air pressure and the counter of working hours interval The switches for lights are combined in the panel too period of time
Optonal attachments
-coal bucket
-rock bucket
-rapid adjust hitch
-wood grapple
-grass grapple
-pallet fork
Loading and package deal
-one device for every 40HQ container or two models in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a steel frame
-main human body EPTd into container right
-fastened with professional metal ropes
Warranty and servce colon
one rpar One particular calendar year guarantee for EPT EPT period of time
2 rpar All spare components are obtainable as we generate most of the components in our manufacturing facility period
3 rpar We can offer technical assist via mail comma cellphone comma online video or sending engineers there period
four rpar EPT procedure and servicing manul and components list are shipped with the loaders period of time
Our products assortment colon
We make wheel loaders with bucket potential from 1 period8m3 to 3m3 period of time
We also produce excavators from one period8ton to 42ton period
All EPTs are CE certificated period
Our factory tour colon
We make most of the parts and it is far better for quality manage program time period And it is straightforward to get the spare components from us right also interval
Technical specs colon
Simple Knowledge | |
Bucket capacity | 1 period8 m sup3 |
Rated load | 3200 kg |
Procedure weight | 12440 kg |
Dumping top | 3060 mm |
Dumping get to | 1008 mm |
Breakout force | 97 kN |
Traction power | 100 kN |
Wheel foundation | 2750 mm |
Total EPT cycle time | ten period3 s |
Entire bucket lifting time | 5 period6 s |
Min period turning radius | 5376 mm |
Overall dimension lparL timesW timesH rpar | 6970 times2450 times3228 mm |
Motor | |
Model | CUMMINS 6BT5 period9-C130 |
Rated EPT | 97 kw |
Rated speed | 2200 rpm |
Max interval torque | 560 N periodm |
Fuel consumption | 225 g solkw periodh |
EPT Method | |
Equipment box variety | planetary EPT shift |
EPT pace I | twelve km solh |
EPT velocity II | forty km solh |
Reverse velocity | 17 km solh |
Torque converter kind | single phase four aspects |
Axle variety | 4-wheel EPT |
Tire size | seventeen period5-25-12PR |